What we build, in detail

Four kinds of aluminium work, all engineered and permitted where required.

Program 01 · A permitted structure

Screen enclosures & pool cages

Wind load depends on your address, not on a general figure — exposure near open water is different from a sheltered inland lot. We build to an approved product specification for your location, pull the permit and attend the inspection, because an unpermitted enclosure becomes the owner's problem at resale and with insurance.

  • 1 to 3 weeks
  • Homeowners
  • Measured quote
  • Permit and HOA approval

Start this program

Stage 1 · Measure

On site, with exposure assessed.

Stage 2 · Engineer

To the design wind load for the address.

Stage 3 · Permit

Pulled, with the approved specification.

Stage 4 · Build & inspect

Signed off by the authority.

Stage 1 · Purpose

Guard rail, or pool barrier.

Stage 2 · Requirements

Height, gaps, gate hardware.

Stage 3 · Build

To code, not to preference.

Stage 4 · Inspect

Attended through to sign-off.

Program 02 · Pool barriers are different

Railings & gates

An ordinary railing and a pool barrier are not the same product. Barrier height, gap dimensions, and self-closing self-latching gates with the latch at the required height are set by law, and an inspector checks each one. We build to those, and refuse designs that fail them.

  • Per project
  • Homes and businesses
  • Measured quote
  • Inspection

Start this program

Program 03 · Ventilation matters

Soffit, fascia & gutter

Soffit is not just trim — it ventilates the attic, and blocking it to make a tidy line traps heat and moisture in the roof structure. We keep the required ventilation area, and we deal with rotten fascia rather than cladding over it, which is the shortcut that hides a problem for five years.

  • 2 to 5 days
  • Homeowners
  • Measured quote
  • Access

Start this program

Stage 1 · Inspect

Fascia condition and existing ventilation.

Stage 2 · Repair first

Rotten timber replaced, not covered.

Stage 3 · Install

With ventilation area maintained.

Stage 4 · Gutter

Sized and pitched to actually drain.

Stage 1 · Setbacks

What the lot and code actually allow.

Stage 2 · Engineer

Footings and uplift, to wind load.

Stage 3 · Permit

Pulled before fabrication.

Stage 4 · Build & inspect

Through to sign-off.

Program 04 · Also permitted structures

Carports & awnings

People are often surprised that a carport needs a permit and engineering. It does: it is a roof structure in a hurricane zone, and an unpermitted one is both a code violation and a thing that becomes airborne. We quote it properly rather than cheaply.

  • 1 to 2 weeks
  • Homes and businesses
  • Measured quote
  • Permit and setbacks

Start this program

Thinking about an enclosure?

A free measured quote, with engineering and the permit included in the price.